4
MOUNTING
4
Mounting
5
Electrical installation
6
LED indicator yellow: Status of received
6
light beam
LED indicator green: Supply voltage
7
active
Potentiometer: sensitivity adjustment
8
Mount sensors (sender and receiver) using suitable mounting brackets (see the SICK
range of accessories). Align the sender and receiver with each other.
< 0.4 Nm
NOTE
Swap the sender and receiver arrangement at every second photoelectric through-
beam sensor and ensure that there is sufficient distance between the through-beam
photoelectric sensors.
Sender (GS)
Receiver (GE)
Sender (GS)
Figure 3: Arrangement of several through-beam photoelectric sensors
The sensors must be connected in a voltage-free state (U
tion must be observed, depending on the connection type:
–
Male connector connection: pin assignment
–
Cable: wire color
Only apply voltage/switch on the voltage supply (U
tions have been established. The green LED indicator lights up on the sensor.
Explanations of the connection diagram (Tables 2 and 3):
Q / Q = switching outputs
n. c. = not connected
LED indicator yellow: Status of received
6
light beam
LED indicator green: Supply voltage
7
active
Potentiometer: sensitivity adjustment
8
= 0 V). The following informa‐
V
> 0 V) once all electrical connec‐
V
Subject to change without notice
Receiver (GE)
Sender (GS)
Receiver (GE)
8021852 | SICK