Cable Management - PEERLESS SA761P Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Cable Management

NOTE: Make sure cables have enough slack to
7
allow full movement of the arm.
Run power cable through top or bottom of arm (A)
and signal cable(s) through other side of arm in
order to avoid interference with the signal. Lock
cables into place by snapping cable covers (J &
B) onto mount as shown. Screen may have to be
moved for easy access.
Optional: If additional cable management is
required route cable ties (G) through slots of arm (A)
as shown in detail 3.
Snap wall plate covers (F) to top and bottom of wall
8
plate rails as shown.
B
SLOT
G
DETAIL 3
WALL PLATE RAIL
F
9 of 32
J
A
CABLE
ISSUED: 03-30-10 SHEET #: 095-9346-1

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sa761p-s

Tabla de contenido