Advance Planning; Ductwork Planning - Monogram ZV850 Instrucciones De Instalación

Ocultar thumbs Ver también para ZV850:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

DUCTWORK PLANNING

through the ceiling. Use locally supplied elbows to
vent horizontally through the rear wall.
configurations.
outdoors.
12".
ceiling joists or straight up through the roof.
opening. Order the wall or roof cap and any
transition and length of duct needed in advance.
air system in accordance with local building code
requirements. Visit Monogram.com for available
makeup air solutions.
WARNING
4

Advance Planning

CEILING FRAMING FOR ADEQUATE
SUPPORT
Accessory Duct Cover
support must be provided. The ceiling structure
must be capable of supporting the weight of the
hood and any inadvertent user contact loads
framing.
before the cooktop or countertop below
is installed.
31-10725 Rev. 6

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Zv855

Tabla de contenido