DETERMINE INSTALLATION HEIGHT
the ductwork running to the ceiling.
shipped with the hood.
NOTE: Installation height should be measured from
the cooking surface to the lowest part of the hood.
limitations.
DUCT COVER DIMENSIONS
ZX8510SPSS Duct Cover
Accessory
The accessory is available for
and one 31" upper support frame
piece.
8
Installation Preparation
24" Minimum
30" Maximum
36" Minimum
"
Installation Heights
*Possible
Actual
VENTED
Ceiling
Installation
Height
8'-1"
8'-2"
8'-3"
8'-4"
8'-8"
8'-11"
8'-8"
8'-11"
"
ZV850/ZV855
*Possible
RECIRCULATING
Height
Installation Height
24"
24"
24" to 28"
24"
24"
24" to 28"
31-10725 Rev. 6