REMOVE THE PACKAGING
CAUTION
edges.
The vent hood is packed with the duct cover and
support frames.
(not supplied).
NOTE:
required to construct your ceiling support.
Check Installation Hardware
Locate the hardware accessory bag packed with the
hood and check contents.
wood lag
screws
2-1/2")
and lock
washers
2 Utensil rods with 4 machine screws
31-10725 Rev. 6
Installation Preparation
duct cover
screws
2 Stop screws
(One is in the service
manual envelope.
Leave that screw in the
envelope.)
attachment screws
with washers
(attached to
accessory support
frames)
Support
frames with 8
screws and 8
washers
washers
Front of Hood
Template
duct connector and 4
small flat-head screws
Mounting screw holes
Decorative
duct covers
3 Stainless
steel grease filters
3 Charcoal filters