Installation Instructions - Deltaplus LV100 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 7
Example of installation in a concrete wall
Components required
Concrete wall 25 Mpa
free from cracks.
Minimum thickness
160 mm
Hole Ø 14mm, 115mm
Summary table of DPU phase and hardening times
Bracket temperature
-5° to 0°
0° to +10°
+10° to +20°
+20° to +40°
Note: These times must be doubled for wet concrete
For any other type of bracket, support structure, attachment method or for any other additional information, contact the
manufacturer or an authorised and qualified person.
For attachments to steel or wood: A qualified engineer must check by calculating that the design and mounting data are
compatible with the force applied within the framework of the test type (600daN)
BP140 - ZAC la Peyrolière
84405 APT CEDEX France

INSTALLATION INSTRUCTIONS

deep
-1- Drill a hole Ø 14mm, 115mm deep.
The minimum distance from the edge must be 145
mm. The distance between 2 holes must be > or =
to 165mm.
-2- Clear the hole of any dust.
-3- Check the depth and insert the chemical anchor
or capsule.
-4- Insert the rod in hammer mode. The rod grinds
the mixture.
-5- Do not touch during the DPU phase. Remove
the excess outside the hole.
-6- Once the hardening time is over, the installer
should check suitability for use by subjecting the
structural anchor to an axial load of 500 daN for 15
seconds. See # Checks.
-7- Put the anchor bar and the M12 washer in place
and screw in the M12 nut. Apply a tightening torque
of 40 Nm.
DPU
Complete hardening time
60 mn
5 hours
30mn
60mn
20mn
30mn
8mn
20mn
LV100 Anchorage ring device
Chemical
anchor or
capsule
A4 stainless steel
M12 threaded rod
(130 mm long)
i.e > 12kN (coef. 2 included).
UPDATE : 07.05.2015
Stainless steel
M12
A2 stainless
steel M12
LV100 anchor
bar
-8-
Directions specified for using the
LV100 anchor bar.
Example of attachment to a wall.
Page 3/52
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido