Enerpac ACBS-22 Hoja De Instrucciones página 5

Bloque acumulador
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 19
OPERATION
To Clamp System
1. Connect the AH-650 female coupler to the AH-652 male coupler on the pump
2. Make sure that the valve is turned fully counter-clockwise in the open
3. To supply oil to the system, energize the pump unit.
4. Use the gauge mounted on the accumulator block to verify clamping pressure.
5. With the oil supply still energized, close the valve handle by turning it fully
6. De-energize the pump unit and then disconnect the female coupler from the
7. Check the accumulator block gauge to re-verify system pressure.
To unclamp system
1. Connect the AH-650 coupler(s) to the AH-652 male coupler(s).
2. Open the valve by rotating it to the full counter-clockwise position.
3. Single-acting systems will release oil pressure back to the pump tank when he
A CAUTION
Never open the valve handle on a pressurized system without first connecting the
couplers to allow oil to drain back.
A CAUTION
If the shut-off valve is in the open position, the accumulator block gauge must be
fully relieved of system pressure before the female coupler is removed.
port of the accumulator block. Double-acting systems require an additional
male AH-652 and female AH-650 coupler for the retract port of the
accumulator block.
position.
clockwise.
accumulator block.
valve is opened. To unclamp a double-acting system, energize the pump and
supply oil to the retract port of the accumulator block.
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Acbs-202

Tabla de contenido