4 Operation
Layout of the installation assistant
A
C
Figure 3: Layout of the installation assistant (example)
Position
Designation
A
Configuration steps
B
User information
C
Configuration field
Requirement:
☐ When configuring after completion of the first ten feed-in hours or after exiting the installation
assistant, the SMA Grid Guard code must be available in order to change the grid-relevant
parameters (see "Application for SMA Grid Guard Code" at www.SMA-Solar.com).
Procedure:
1. Activate the user interface (see Section 4.1, page 19).
2. Log in as Installer.
3. Select the menu User Settings (see Section 4.3, page 24) on the start page of the user
interface.
4. In the context menu, select [Starting the installation assistant].
☑ The installation assistant will open.
4.7
Activate WPS Function
The WPS function can be used for different purposes:
• Automatic connection to a network (e.g. via router)
• Direct connection between the product and an end device
Depending on the intended application of the WPS function, the procedure for activation will vary.
28
STP33-62-US-41-BA-en_es-10
Description
Overview of the installation assistant steps. The number of
steps depends on the type of device and the additionally
installed modules. The current step is highlighted in blue.
Information about the current configuration step and the
setting options of the configuration step.
You can make settings in this field.
SMA Solar Technology AG
B
User Manual