Event number
Message, cause and corrective measures
10110
Time synchronization failed: |xx|
No time information could be called up from the set NTP server.
Corrective measures:
• Ensure that the NTP server was configured correctly.
• Ensure that the inverter is integrated into a local network with Internet
10118
Parameter upload complete
The configuration file was loaded successfully.
10248
[Interface]: network busy
The network is busy. Data exchange between the devices is not at an optimum
and is greatly delayed.
Corrective measures:
• Increase the query intervals.
• If necessary, reduce the number of devices in the network.
10249
[Interface]: network overloaded
The network is overloaded. There is no data exchange between the devices.
Corrective measures:
• Reduce the number of devices in the network.
• If necessary, increase the data query intervals.
10250
[Interface]: package error rate [ok / high]
The package error rate has changed. If the package error rate is high, the net-
work is overloaded or the connection to the network switch or DHCP server
(router) is disturbed.
Corrective measures if the package error rate is high:
• Ensure that with an Ethernet connection, the network cable and the
• If necessary, increase the data query intervals.
• If necessary, reduce the number of devices in the network.
User Manual
connection.
network connector are not damaged and that the network connectors are
correctly plugged.
6 Troubleshooting
STP33-62-US-41-BA-en_es-10
51

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Sunny tripower core1-us stp 33-us-41Sunny tripower core1-us stp 50-us-41Sunny tripower core1-us stp 62-us-41

Tabla de contenido