4 Operation
Accepting the settings
Saving the made settings is indicated by an hourglass symbol on the user interface. If the DC
voltage is sufficient, the data is transferred directly to the inverter and accepted. If the DC
voltage is too low (e. g. in the evening), the settings are saved, but they cannot be directly
transferred to or accepted by the inverter. As long as the inverter has not yet received and
accepted the settings, the hourglass symbol will continue to be displayed on the user interface.
The settings will be accepted when there is sufficient DC voltage applied and the inverter
restarts. As soon as the hourglass symbol appears on the user interface, the settings have been
saved. The settings will not be lost. You can log off of the user interface and leave the system.
4.12 Configuring the Country Data Set
By default, the inverter is set to a universally valid country data set. You must adjust the country
data set for the installation site.
The country data set must be set correctly.
If you select a country data set which is not valid for your country and purpose, it can cause a
disturbance in the PV system and lead to problems with the grid operator. When selecting the
country data set, you must always observe the locally applicable standards and directives as
well as the properties of the PV system (e.g. PV system size, grid-connection point).
• If you are not sure which country data set is valid for your country or purpose, contact
your grid operator for information on which country data set is to be configured.
The basic procedure for changing operating parameters is explained in another section (see
Section 4.11 "Changing Operating Parameters", page 31).
Procedure:
• In the parameter group Grid monitoring > Grid monitoring select the parameter Set
country standard and set the required country data set.
4.13 Configuring Feed-In Management
If required by the grid operator, the inverter can provide grid management services. You can
configure these via the inverter feed-in management. Coordinate the configuration of the feed-in
management with your grid operator beforehand.
The basic procedure for changing operating parameters is explained in another section (see
Section 4.11 "Changing Operating Parameters", page 31).
Procedure:
1. Activate the user interface (see Section 4.1, page 19).
2. Log into the user interface as an Installer.
3. On the right-hand side of the menu bar, select the menu User Settings (see Section 4.3 "Start
Page Design of the User Interface", page 24).