9.5 MANAGEMENT OF THE TEST REGARDING THE CORRECT INSERTION OF THE
CORE PROBE
Temperature-controlled cycles are preceded by a 2- phase test for the verification of the correct
insertion of the needle probe.
The second phase is only performed if the first is not completed successfully.
The first phase is completed successfully if the "temperature detected by the needle probe –
chamber temperature" difference is greater than 5°C in at least 3 controls out of 5 (the controls
are performed at 10 seconds intervals, consider the difference without sign).
The second phase is completed successfully if the "temperature detected by the needle probe
– chamber temperature" difference is 1°C higher with respect to the previous control in at
least 6 controls out of 8 (the controls are performed every 8 seconds). If the test is completed
successfully, the cycle will be started; if the test is not completed successfully, the
will flash and the buzzer will be activated for 2 seconds.
To start the temperature-controlled cycle, press the BLAST CHILLING key or the DEEP-
FREEZING key.
After 1 min from the signal that the test has not been completed successfully without having
operated, the cycle is started with time control.

9.6 PRE-COOLING START-UP

Every operating cycle can be preceded by pre-cooling.
Operate as indicated to start pre-cooling:
Make sure the device is in the "on" status.
Make sure no procedures are in progress
Hold the BLAST CHILLING key down for 1 s: the
Operate as indicated to cut-off pre-cooling:
Hold the BLAST CHILLING key for 1 second or start an operating cycle.
When the cabinet temperature reaches 5°C, pre-cooling continues, the
permanently and the buzzer is activated for 1 s.
9.7 SWITCHING THE OZONE SANITIZATION CYCLE
(Only for models with Ozone Sanitization option)
Operate as follows:
Make sure the device is in the "on" status and that the door is closed.
Make sure that the keyboard is not locked and that no procedure is in progress.
Hold the AUXILIARY key down for 1 s: the AUX LED will switch on.
The ozone generator is switched on for 5 minutes; opening the door cause the generator to
switch off

9.8 CORE PROBE HEATING

(Only for models with Heated Core Probe option)
Operate as follows:
Make sure the device is in the "on" status or storage is in progress and that the door is open,
Make sure that the keyboard is not locked and that no procedure is in progress.
Hold the AUXILIARY key down for 1 s: the
Core Probe is heated until the temperature detected by the needle probe reaches 40°C; closing
the door causes heating to be cut-off.
The buzzer is activated for 1 second on conclusion of heating.
50LIB055
LED will flash.
LED flashes and the AUX LED will switch on.
18
LED
LED remains on

Publicidad

Tabla de contenido
loading

Productos relacionados para Apach ASH05K

Este manual también es adecuado para:

Ash05k dfAsh05k lpAsh05k l

Tabla de contenido