Blast Chillers
4-UNIT POSITIONING
•
The blast chiller must be installed and
inspected in complete compliance with
accident-prevention Law Standards, with
state of the art rules and with Standards now
in force.
•
The installer must check potential fire-
prevention prescriptions (contact the nearest
fire station for the due indications).
•
Place the unit where the air suction from the
front of the unit and air discharge from the
back of the unit is not obstructed in any way.
•
Level the unit through of the adjustable feet.
•
If the appliances are not leveled, their
operations and condensation outflow can be
affected.
•
Do not place the unit in direct exposure to
sunlight.
•
Do not place the unit in limited air exchange areas.
•
Do not install the unit in proximity of heat sources.
5-INSTALLATION
Installation shall be carried out by authorized and specialized personnel, complying with the
instructions in this manual.
The manufacturer declares and associates a declaration of conformity to machinery Directive 98/37,
to Directive 2006/95 and to Directive 2004/108/CE for each individual machine.
5.1 LEGS INSTALLATION
Lift the unit and tightly screw the legs in the appropriate sockets int base corners. Level the unit
by means of leg regulation screw.
50LIB055
6