Introduction Into The Boiler Room - Ygnis VARJET Serie Manual Tecnico

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 106
6.2.3
So as to limit the sound level due to vibration propagation (see assembly instructions), it is possible to install the
boiler on anti-vibration mounts (option).
b
A
A
l
with shock absorbing mounts
Varjet
Front and rear side
Boiler block + condenser
length (LRPK)
Boiler foot length
Boiler foot width
Shock absorbing mount
length
Assembly is done according to the separate instructions supplied with the equipment.
You can then start with fitting the pipes on the water connection side.
Once the boiler is filled it settles by 2 to 3mm.

6.3 Introduction into the boiler room

The boiler is delivered on a wooden pallet allowing it to be brought in using a forklift truck, a roller transporter or a
reinforced roller.
In addition the boiler has two lifting eyes. So it can also be brought in using a hoist or similar.
After introducing the boiler, detach and remove the wooden pallet.
1NO0P0007-D
Varjet 1 - 14
Anti-vibration boiler support (option)
A-A
5
40
45
e
b
1
2
3
D mm
1220 1220 1310 1310 1310 1310 1310 1310 1310 1310 1310 1600 1600 1600
T mm
1485 1485 1667 1667 1892 1892 2062 2320 2320 2348 2348 2608 2608 2608
l mm
844
844
986
b mm
640
640
740
e mm
130
130
130
2 lifting eyes
b
ca. 30
B
B
without shock absorbing mounts
4
5
6
7
986
1186 1186 1186 1445 1445 1445 1445 1701 1701 1701
740
740
740
790
790
130
130
130
130
274
b
l
0005A X
8
9
10
11
12
790
870
870
938
274
274
274
274
1NO0P0001_F12
B-B
40
13
14
938
938
274
274
87

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido