Riello RS 55/M BLU Instrucciones De Instalación, Uso Y Mantenimiento página 18

Quemadores de gas con aire soplado
Ocultar thumbs Ver también para RS 55/M BLU:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

allows it, by closing the ring nut 2) (Fig. 13) you obtain reductions
in the formation of NOx.
If the pressure in the combustion chamber is
equal to 0 mbar, the air and gas/air adjustments
must be adjusted with reference to the hatched
WARNING
line in the diagrams.
Once the head is adjusted, reassemble the burner on the guides
3)(Fig. 15) at about 100 mm from the pipe coupling 4) - burner in
the position shown in Fig. 10 on page 14
 Insert the probe and electrode cables, then slide the burner
as far as the pipe coupling - burner in the position shown in
(Fig. 15).
 Refit screws 2) on slide bars 3).
 Fix the burner to the pipe coupling with the screw 1).
 Re-couple the articulated coupling 6) to the graduated sec-
tor 5).
When fitting the burner on the two slide bars, it is
advisable to gently draw out the high voltage ca-
ble and the flame detection probe cable until they
WARNING
are slightly stretched.
20040559
Installation
N notches (air = gas)
2
1
16
GB
Max. burner output
3
4
5
6
D11604
Fig. 14
D11483
Fig. 15

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

832t20038459200384842003848220038486

Tabla de contenido