Mounting The Current Clamp En; Operation - Abicor Binzel xFUME VAC ADVANCED Instructivo De Servicio

Extractor de humos alto vacío
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7 Operation

6.6.1 Mounting the current clamp
The extraction system comes with a current clamp. A second current clamp is optionally available for the connection of
a second fume extraction torch.
1 Attach the current clamp to the connector (10).
 Fig. 5 Control elements/ports on page EN- 15
NOTICE
• Ensure that the red dot on the current clamp is always pointing in the direction of the current flow.
1
Current clamp
Fig. 4
Mounting the current clamp
2 Place the current clamp (1) over the cable assembly (3).
3 On the control panel, set the Auto On/Off switch (3) to "On".
 Fig. 5 Control elements/ports on page EN- 15
7 Operation
WARNING
Health risk due to harmful dust
Before and during operation, please observe the following:
• During operation, the complete extraction system must be kept closed.
• After switching off the extraction system, wait at least one minute before opening the dust collecting drawer.
CAUTION
Risk of injury
Injuries may be caused by improper handling.
• Do not draw in any flammable substances or liquids.
• Ensure sufficient ventilation while operating the extraction system.
 6.1 Transport and installation on page EN- 11
NOTICE
• Only qualified personnel are permitted to perform work on the device or system.
• Consult the documentation for the welding components.
 6 Putting into operation on page EN- 11
 Fig. 5 Control elements/ports on page EN- 15
1 Set the Device On/Off switch (4) on the extraction system to the "On" position.
EN - 14
1
2
3
2
Red dot
xFUME VAC ADVANCED
3
Cable assembly
BAL.0731.0 • 2019-09-18

Publicidad

Tabla de contenido
loading

Tabla de contenido