8 Recommissioning the Inverter
10. Insert the DC load-break switch firmly into the recess
on the inverter. During this process, the DC load-
break switch must still be in position O and aligned
so that the screws are positioned over the threads.
11. Tighten the 2 screws using an Allen key (AF 3,
torque: 2 Nm ± 0.2 Nm).
12. Turn the DC load-break switch of the inverter to
position I. If available, switch on the external DC
switch.
13. Switch on the circuit breaker of all 3 line conductors.
20
DC-EMV-STPTLEE-10-RM-xx-10
SMA Solar Technology AG
Replacement Manual