Step 20
Follow the numbered diagram in numerical order and in the direction of the dashed arrows.
å
1. Turn the nut closest to the hammer end off the threaded area.
2. Slip the threaded portion of the cable through the opening in the CABLE BRACKET (72G). Turn the nut back onto the
å
threaded end of the cable. Be sure both nuts are tight against the bar of the CABLE BRACKET (72G).
3. Push the hammer shaped end of the cable into the opening of the pointed end of the ACTUATOR PULL (120M).
å
4. While holding the ACTUATOR PULL (120M) and cable assembly together, fasten the ACTUATOR PULL (120M) to the
å
LIFT TOP (I). Use two BLACK 9/16" LARGE HEAD SCREWS (1S).
NOTE: The screws should be centered in the slotted holes and should not be completely tighten to allow the ACTUATOR
å
PULL to slide back and forth.
www.sauder.com/services
BLACK 9/16" LARGE HEAD SCREW
(2 used in this step)
422624
1. Turn this nut
off the threads.
1S
72G
2.
3.
I
I
4.
120M
Page 25