5.
ASSEMBLING THE COOKING GRID
Parts Required:
1
x
Swing Handle (#1)
1
x
Lift Handle (#3)
1
x
Cooking Grid (#4)
4
x
Screw (#C)
Installation:
•
Mount the Swing Handle to the
side of the Cooking Grid using two
screws. Note illustration 5A.
•
Mount the Lift Handle to the top of
the Cooking Grid using two screws.
Note illustration 5B.
6. ASSEMBLING THE CHARCOAL PAN
Parts Required:
2
x
Charcoal Pan Handle (#6)
1
x
Charcoal Pan (#7)
4
x
Screw (#A)
4
x
Nut (#B)
Installation:
•
Place a Charcoal Pan Handle to one
inside edge of the Charcoal Pan and
using two screws and nuts. Repeat
same procedure for opposing side.
7.
ASSEMBLING THE LID
Parts Required:
1
x
Lid Ring (#2)
1
x
Lid (#5)
1
x
Nut (#B)
Installation:
•
Insert the Lid Ring into the top of
the Lid and secure using one nut.
8
5A
1
C
5B
6
6
B
A
7
3
C
6
B
A
7