Decommissioning, Removal And Disposal - ProMinent DULCOTEST CLO 1 Manual Del Operacion

Ocultar thumbs Ver también para DULCOTEST CLO 1:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Decommissioning, Removal and Disposal

9 Decommissioning, Removal and Disposal
n
Users' qualifications: technical expert, see
Ä Chapter 1.2 "Users' qualifications "
on page 10
To decommission, disconnect the sensor, pull it
out of the flow gauge housing by releasing the
clamping screw and unscrew the sensor cap.
Remove all gel electrolyte from the electrodes
and sensor cap under a stream of water and then
allow to dry dust-free; then loosely screw on the
sensor cap. To protect the electrodes, press the
protective cap onto the sensor cap.
Observe the run-in times before calibration when
recommissioning .
The decontaminated sensor can be handed in at
any branch of ProMinent for disposal.
32

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dulcotest clo 2103387110338701033878

Tabla de contenido