Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION SYSTEM

4. INSTALLATION DIAGRAM

Descaled water
5. POLYPHOSPHATE FILTER
(OPTIONAL)
16 x 12
transparent hose
Drainage
*Representative diagram
WATER SOFTENER EQUIPMENT INSTALLATION
The installation of this water softener must be
carried out by the AUTHORISED SERVICE TECHNI-
CIAN and in accordance with the instructions
specified by your country's legislation.
Follow the steps listed below to ensure correct
installation:
1. Check mains water pressure: it must be a
minimum of 2.5 bar and 6 bar as a maximum.
Remember that the water temperature must be
between 5˚C and 40˚C.
2. Before proceeding with the installation, shut off
the mains water stopcock in the same place that you
are going to carry out the installation and turn on a
tap to depressurize it.
3. Choose a place for installation near an electrical
A
Overflow
outlet
B
6. BYPASS
IMPORTANT:
Remember to install the overflow and drainage of
the equipment through different hoses until the
trap. Using a Y-shaped piece can improve water
return during regeneration.
power socket of 220V ~ 50 Hz
4. Check the correct status of the pipework.
5. Remove the lid that covers the valve and then the
deposit lid on your water softener. Remove the
bypass valve and the transformer
6. Connect the entrance and exit hoses to the
bypass:
1
1
5
Mains water
C
1. SEDIMENT FILTER
(OPTIONAL)
2. VALVE
(inside the casing)
4. SALT DEPOSIT
3. RESIN TANK
(inside the salt deposit)
1. Entrance connection.
2. Exit connection.
3. Electrical connection.
2
3
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Atlantis tm69 lcd

Tabla de contenido