Intended Use; Operating Principle; Installing The Inverter - Waeco CoolBreeze CB-1200-AC Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 80
IA_CB-1200.book Seite 51 Montag, 18. April 2005 4:15 16
CB-1200
8.2

Intended use

The inverter should only be operated in combination with the
CB-1200-AC/DC fresh air cooling system.
Other installations are not allowed and may destroy the inverter or the
connected device.
The CB-1200-AC/DC fresh air cooling system can be operated with the
WAECO CB-WS-300 inverter with a voltage of 230 V AC and a battery
voltage of 12 V.
8.3

Operating principle

The CB-WS-300 inverter has two functions:
To generate 230 V of alternating current from a 12 V battery supply.
To automatically switch over between 230 V of external mains voltage
and 230 V of generated voltage. The external supply has priority.
8.4

Installing the inverter

Front view of the CB-WS-300
No. in 0 Description
Rear view of the CB-WS-300
No. in a Description
The existing standard installation of the charge controller must be
protected with a fuse with at least 30 A!
The minimum cable cross section should be 6 mm
The inverter may only be installed by a qualified workshop. The following
information is intended for technicians who are familiar with the guidelines
and safety precautions to be applied.
All manuals and user guides at all-guides.com
1
230 V power supply connection
2
230 V
output
AC
3
Fuse 6.3 AT
(
1
Fan
2
Positive terminal
3
Negative terminal
4
Connection for the control line of the fresh air cooling
system
Inverter (only for the CB-1200-AC/DC)
(
)
0
, page 6
:
)
a
, page 6
:
.
2
51

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Coolbreeze cb-1200-ac/dc

Tabla de contenido