IA_CB-1200.book Seite 47 Montag, 18. April 2005 4:15 16
CB-1200
➤ Fasten the pump control with screws to a firm surface near the water tank.
➤ Connect the connection cables according to the circuit diagram on the
pump control (g 1).
➤ Connect the 12 V supply to the pump control according to the circuit
diagram (g 3) (not included in the scope of delivery).
➤ Connect the level controller as follows (g 2):
Basic – green, 20 % – brown, 90 % – white.
During operation it must be ensured that there is always a sufficient
amount of water in the fresh water tank of the caravan, since the
immersion pump may otherwise be irreparably damaged if it runs dry.
6.8
Inspection before start-up
Please observe the following points before you start the CoolBreeze fresh
air cooling system:
Ensure that both the air intake opening and the air nozzles are not
obstructed. All ventilation grilles must always be kept free to ensure that
the air conditioner is able to operate at maximum capacity.
Only for operation with the 10 l buffer tank: Ensure that the fresh water
tank is sufficiently filled with water so that the immersion pump cannot
be damaged when filling the buffer tank.
Check all water hose connections in the entire system as well as the
water tanks for leakage.
Do not insert your fingers or objects into the air distribution nozzles or the
intake grille.
6.9
Replacing the humidifier (
The humidifier in the fresh air cooling system must be checked regularly
every two years and you must remove any dirt and deposits found.
Have the humidifier replaced only in a qualified workshop.
➤ Open the the upper shell casing of the fresh air cooling system.
Unscrew the screws in the roof unit.
➤ Open the interior bonnet and carefully remove the seal fitting on the side.
The water distributor is located in the humidifier hood. If there is dirt
blocking the drill holes, insert a new water distributor (order no.
All manuals and user guides at all-guides.com
Installing the fresh air cooling system
page 8)
h ,