REFRIGERANT PIPING &
REFRIGERANT CHARGE
11.5. ADDITIONAL REFRIGERANT CHARGE CALCULATION FOR LIQUID PIPING (W1 KG).
See the examples and fill in the following tables:
•
Single system
■
RASC-5/10
Twin sample
■
9.53
RASC-5
9.53
9.53
Triple sample
■
12.70
RASC-10
9.53
9.53
Quad sample
■
12.70
RASC-10
9.53
9.53
9.53
All manuals and user guides at all-guides.com
Model
Actual total Piping Length (m)
Piping size for gas line
Piping size Liquid Line
Factory charged
Quantity in Outdoor unit (Kg)
Additional Charging Quantity for more than 10m
Pipe
Total Piping
Diameter
Length
Ø 9.53
10+10+30 x 0.070 =
10 m Factory Charge
Example
Additional Charge W1 Total =
Pipe
Total Piping
Diameter
Length
Ø 12.7
Ø 9.53
3+3+6 x 0.070 =
9.53
10 m Factory Charge
Example
Additional Charge W1 Total =
Pipe
Total Piping
Diameter
Length
Ø 12.7
Ø 9.53
10+8+12+10 x 0.070 =
9.53
10 m Factory Charge
Additional
Example
Charge
RCI-5.0FSN1E
RPI-5.0FSN1E
Indoor Unit
RPC-5.0FSNE
RCD-5.0FSNE
Outdoor Unit
RASC-5HNE
0-50
Out. Dia. (mm)
15.88
Thickness (mm)
Out. Dia. (mm)
Thickness (mm)
70 g/m
Total Additional Charge W1:
Additional Charge (Kg)
3.50
Outdoor Unit Factory Charge Wo:
W (10m) =
-0.70
Total Ref. Charge of this System:
2.80 (Kg)
Year
Total Additional Charge W1:
Additional Charge (Kg)
15 x 0.120 =
1.80
Outdoor Unit Factory Charge Wo:
0.84
W (10m) =
-1.20
Total Ref. Charge of this System:
1.44 (Kg)
Year
Total Additional Charge W1:
Additional Charge (Kg)
15 x 0.120 =
1.80
Outdoor Unit Factory Charge Wo:
2.80
Total Ref. Charge of this System:
W (10m) =
-1.20
W1 Total =
3.40 (Kg)
PMGB0126A rev.2 - 11/2006
RPI-10.0FSNE
RASC-10HNE
0-30
25.40
1.0
1.0
9.53
12.7
0.8
1.0
4.8
8.5
120 g/m
Month
Day
Month
Day
Year
Month
Day
21
2.80
Kg
4.80
Kg
7.60
Kg
1.44
Kg
8.50
Kg
9.94
Kg
3.40
Kg
8.50
Kg
11.90
Kg