High Altitude Operation - Power Stroke PSi2100G Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

NOTE: To prevent short circuit, keep away from a metal
surface during clamp connection.
 Connect the battery charging cable assembly to the
12 V DC receptacle.
 Start the generator.
NOTE: The AC receptacles can be used while the DC
receptacle is in use.
 The battery will become slightly warm to the touch while
charging. This is normal and does not indicate a problem.
NOTE: Only use battery charging cable assembly to
charge vented wet lead acid batteries.
 When batteries become fully charged, disconnect
the battery charging cable assembly from the battery.
Disconnect the negative (black) wire first, then the positive
(red) wire, being careful not to short across the terminals.
Always abide by the safety warnings provided with the
battery.
OPERATION
NOTE: Most batteries will be completely charged after
30 to 120 minutes. However, it is highly recommended
that you refer to your battery manufacturer's instructions
for specific charge times.
 Unplug battery charging cable assembly and store for
later use.

HIGH ALTITUDE OPERATION

Your engine is configured for operation below 2000 feet
altitude at the factory. Your engine must be reconfigured for
operation above 2000 feet altitude. Operating the engine
with the wrong engine configuration at a given altitude may
increase its emissions, decrease fuel efficiency, degrade
performance, and cause irreversible damage. Engines
configured for high altitude operation cannot be operated
in standard altitude conditions. A qualified service center
should ensure that your engine is properly configured for
your location.
15 — English

Publicidad

Tabla de contenido
loading

Tabla de contenido