Zodiac YACHTLINE 490 Manual Del Propietário página 60

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INFLATING THE BUOYANCY CHAMBER
• Place the adapter corresponding to the diameter of the semi built-in valve at the inflation
pump hose nozzle.
Inflate the buoyancy chamber, balancing the pressure between the different compartments
until the partitions (a) are no longer visible (pressure = 240 mb)
Never put a compartment
under pressure while the
others are still fully
When you have finished inflating: Screw on the inflation valve plugs.
NOTE:
BUOYANCY CHAMBER - PRESSURE
deflated.
1
2
A slight loss of air is normal before the cap is screwed on.
Only the plugs provide final airtightness.
16 / 43
a

Publicidad

Tabla de contenido
loading

Tabla de contenido