15
Pre-commissioning when AC Power is Not Connected
1
Download SolarEdge SetApp
Download
5
Disconnect and remove power bank
6
Turn switches to OFF
7
Wait until inverter turns-off (all LEDs turn-off)
42
MAN-01-00784-1.6
2
Turn ON
ON
9
Power bank: 60W
output port , USB-C
Power Delivery (PD):
20V 3A (not provided)
3
Connect power bank
10
1 meter, USB-C / USB-C (not provided)
(Option 1)
4
Start and follow SetApp
Start
11
Use SetApp for selection of
Country Settings and configuration
8
Cover connector
when not used