Descargar Imprimir esta página

Pit Boss PRO Serie Montaje Y Operación página 12

Ocultar thumbs Ver también para PRO Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

12. MOUNTING THE RACK HANGER
Parts Required:
1
x
Rack Hanger (#10)
Installation:
Secure the Rack Hanger to the back panel of the Main Barrel using
the pre-assembly two screws. Cooking Racks can be hung on the Rack
Hanger while not in use.
13. PLACING THE GREASE BUCKET
Parts Required:
1
x
Grease Bucket (#16)
Installation:
Place the Grease bucket on the spout hook on the end of the Main
Barrel. Ensure it is level to avoid grease spills.
The unit is now completely assembled.
14. CONNECTING TO A POWER SOURCE
STANDARD OUTLET
This appliance requires 110-120 volt, 60 Hz, 315 w. It must be a 3-prong
grounded plug. Ensure grounded end is not broken off before use. The
control uses a 110-120 volt, fast-blow fuse to protect the board from
the ignitor.
GFCI OUTLETS
This appliance will work on most GFCI outlets, with a recommended
size of 15 amp service. If your GFCI outlet is highly sensitive to power
surges, it will likely trip during the start-up phase of operation. During
the start-up phase, the ignitor draws 200-700 watts of electricity
which can be too much power for a GFCI outlet to handle. Each time it
trips, it increases in sensitivity. If the GFCI keeps tripping, replace the
outlet or change to a non-GFCI outlet.
ON THE ROAD
Disconnect the ignitor from the main wiring harness. Use the manual
start-up procedure. A Pit Boss® unit can operate using a 12 volt,
100 watt inverter plugged into your automobile outlet. To use the
automatic ignitor, it is recommended to use a minimum of a 1000
watt inverter.
IMPORTANT: Disconnect unit from power source when not in use.
12
12
13
16
14
10

Publicidad

loading

Este manual también es adecuado para:

Pb1600ps35139522109765549255036