Descargar Imprimir esta página

Kohler Vanity Instrucciones De Instalación página 4

Ocultar thumbs Ver también para Vanity:

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Prepare the Site
CAUTION: Risk of property damage. To properly support the weight of the vanity and vanity top/sink, secure to
stud framing or 2x6 support behind the finished wall.
Install the vanity to two or more studs, with one stud at each end of the back rail. Locate the studs and determine if
additional 2x6 support is needed.
If installing 2x6 support, install 2x6s between the wall studs at the desired vanity location. The height from the finished
floor to the top of the 2x6 support should be 34-1/2" (876 mm) and flush with the front of the wall studs.
Plan for routing supply and drain piping for your desired sink installation.
NOTICE: To verify proper support and alignment: The finished wall must be straight and plumb. The floor must be flat
and perpendicular to the finished wall.
Complete the finished wall.
1384737-2-B
Back Rail
2x6 Support
4
34-1/2" (876 mm)
Kohler Co.

Publicidad

loading