Descargar Imprimir esta página

Kohler Vanity Instrucciones De Instalación página 7

Ocultar thumbs Ver también para Vanity:

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Secure the Vanity
Back Rail
CAUTION: Risk of product damage. Drill the lag bolt pilot holes near the ends of the back rail to provide
maximum support and to prevent flexing of the unit.
With assistance, lift and place the cabinet in position against the finished wall. Do not slide or side-load the legs.
Verify that the vanity is level and plumb against the wall. If necessary, turn the levelers to adjust the unit.
Verify that there is proper clearance for the doors to open fully.
Using a 1/8" drill bit, drill a pilot hole through each end of the back rail and into the finished wall. Verify that the holes
align with the 2x6 support or a wall stud.
Secure the vanity to the wall with the two 1/4" lag bolts (provided).
Kohler Co.
Pilot
Hole
7
Leveler
1384737-2-B

Publicidad

loading