Descargar Imprimir esta página

Checchi & Magli DUAL 12 GOLD Manual De Uso Y Mantenimiento página 76

Ocultar thumbs Ver también para DUAL 12 GOLD:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Replacing the planting unit chain
E
F
UN41-0222DH
Proceed as outlined below.
1) Loosen the screws (A) and remove the casing (B).
2) Unscrew the nuts (C) and remove the casing (D).
3) Unscrew the nuts (E) and remove the casing (F).
4) Use the tensioner (G) to slacken the chain.
5) Remove the joining link (H).
English language
INFORMATION CONCERNING REPLACEMENTS
6) Remove the chain from the pinions.
7) Fit the new chain on the pinions and on the chain
tensioner (G).
8) Fit the joining link (H).
9) Fit the casing (F) and tighten the nuts (E).
10) Fit the casing (D) and tighten the nuts (C).
11) Fit the casing (B) and tighten the screws (A).
34
C
A
B
D
G
8
H
Use and maintenance

Publicidad

loading