Type C (ø 80/125 coaxial exhaust)
To ensure correct operation of the appliance, do as
follows:
- set the installer parameter PAR 9 as indicated
in TABLE 3 (see point 3.3 to access the installer
parameters).
TABLE 3
G
Maximum length
M
R
exhaust (m)
STAFFA TELAIO
0 - 1,0
CALDAIA
1,0 - 2,0
2,0 - 3,0
3,0 - 4,0
4,0 - 5,0
- proceed with calibrating CO
minimum capacity as specified in point 4.2.2.
2.6
RS-485 BOARD
(fig. 9)
The boiler is provided with the board
RS-485 that permits to manage up to 8
boilers in cascade.
68
68
VERTICAL EXHAUST
PAR 9
(long chimneys)
6
7
Pmin
8
9
Pmax
10
at the maximum and
2
2.6.1
MODBUS mode
This mode allows for MODBUS commu-
nication of at least two boilers in cascade
and is performed by requesting MODBUS
INTERFACE KIT code 8092278.
KEY
2 a
Extension ø 80/125 L. 1000 code 8096171
2 b
Extension ø 80/125 L. 500 code 8096170
3
Hinged tile code 8091300
4 a
Coaxial roof exit terminal code 8091205
10
Inlet/exhaust fitting with test outlet code 8091401
11
Rubber gasket ø 80 (supplied as standard)
12
Condensation recovery ø 80 L. 135 code 8092800
13
Coaxial exhaust ø 80/125 L. 885 code 8091210
14 a
90° curve ø 80/125 code 8095870
14 b 45° curve ø 80/125 code 8095970
Model
Gas connection
110 R ErP
110 R ErP
NOTES:
- Installation requires the use of a condensation recovery
(12) that must be connected to a water drain siphon (waste
water).
- The installation of the coaxial roof exit terminal (4a) requires
the removal of the two ø 60 and ø 100 reducers.
- Before installing accessories, lubricate the internal part of
gaskets with silicon-based products. Avoid using oils and
greases.
- Inserting each supplementary 90° elbow reduces the availa-
ble segment by 1 metres and Inserting each supplementary
45° elbow reduces the available segment by 0.5 metre.
HORIZONTAL EXHAUST
To ensure correct operation of the appliance, do
as follows:
- set the installer parameter PAR 9 as indicated in
TABLE 3/a (see point 3.3 to access the installer
parameters).
TABLE 3/a
Maximum length
exhaust (m)
0 - 1,0
1,0 - 2,0
2,0 - 3,0
3,0 - 4,0
- proceed with calibrating CO
and minimum capacity as specified in point 4.2.2.
2.7
The boiler is supplied with an electric
cable. Should this require replacement, it
must be purchased exclusively from SIME.
The electric power supply to the boiler
H (m)
L (m)
G20
5
4
G31
4
3
PAR 9
(long chimneys)
7
8
9
10
at the maximum
2
Fig. 8
ELECTRICAL CONNECTION

Publicidad

loading