Descargar Imprimir esta página

Sime MURELLE HE 110 R ErP Manual De Instrucciones página 77

Ocultar thumbs Ver también para MURELLE HE 110 R ErP:

Publicidad

Idiomas disponibles

Idiomas disponibles

EXPORT
3.9
"MURELLE HE 110 R ErP" WITH KIT COMPENSATOR CODE 8101581 AND TANK (fig. 15)
7
5
6
4
2
1
S3
17
15
G
22
21
19
R
23
CURVE LOAD LOSSES/CAPACITY BETWEEN THE CONEXIONES R3 and M2
800
700
600
500
400
300
200
100
1000
1500
600
500
8
12
3
11
13
14
16
R3
M2
20
29
M
Murell e HE 92.5 R ErP
Murell e HE 110 R ErP
4500
2000
2500
3000
3500
4000
FLOW RATE (l/h)
PORTATA (l/h)
KEY
1 Gas valve
2 Condensation drain siphon
3 C.H. return sensor (SR)
4 Fan
5 C.H. flow sensor (SM)
6 Safety thermostat 100°C
7 Sensor fumes (SF)
8 Primary exchanger
11 Water pressure transducer
12 Air relief valve
13 Pump high efficiency
14 Boiler discharge
15 Gas cock (not supplied)
16 Non return valve
17 Safety valve 5 bar
18 Non return valve (not supplied)
19 Hydraulic compensator (supplied in the kit)
20 Drain tap (not supplied)
21 Expansion vessel 8 liter (supplied in the kit)
22 Air relief valve (not supplied)
23 Oblique filter (not supplied)
29 Tank (not supplied)
31 Boiler pump (not supplied)
18
31
CONEXIONES
M
C.H. flow
R
C.H. return
G
Gas
S3
Condensation drain
M2
D.H.W. tank flow
R3 D.H.W. tank return
The intended boiler pump (3) should
be dimensioned in function of the
hot water circuit losses (boiler +
piping) and the minimum guaran-
teed capacity (3,800 l/h).
When connecting the storage tank
(29) is necessary:
- configure the parameter installer
PAR 2 = 6.
- electrically connect the boiler
pump (31) to terminals 18-20 the
connector CN9 card.
- electrically connecting the boi-
ler probe L = 6 m, to be reque-
sted separately code 6231332, to
terminals 5-6 the connector CN5
card.
5000 5500
ITALIA
7
5
6
4
2
S3
15
G
25
30
21
22
R
23
800
700
600
Murell e HE 35 R ErP
500
400
Fig. 15
300
200
100
ES
PT
8
12
ENG
3
11
1
13
17
14
16
24
27
28
26
M2
19
20
M
77

Publicidad

loading