Descargar Imprimir esta página

Saivod SAP723 Manual Del Usuario página 145

Publicidad

Idiomas disponibles

Idiomas disponibles

START - END OF SEASON OPERATIONS
START OF SEASON CHECKS
Make sure the power cable and plug are undamaged and the earth system is efficient.
Follow the installation instructions precisely.
END OF SEASON OPERATIONS
To empty the internal circuit completely of water, remove the cap.
Run off all water left into a basin. When all the water has been drained, put the cap back in place.
Clean the filter and dry thoroughly before putting back.
GB
Strictest operation environment:
Cooling mode: 18℃a 35℃ (64°F a 95°F), , 30%RH~90%RH
145

Publicidad

loading