Information Necessary For Contacting Technical Support; Preventive Maintenance - WEG CFW300 Manual Del Usuario

Ocultar thumbs Ver también para CFW300:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Troubleshooting and Maintenance

6.3 INFORMATION NECESSARY FOR CONTACTING TECHNICAL SUPPORT

For technical support or servicing, it is important to have the following information in hand:
Inverter model.
Serial number and manufacturing date listed in the product nameplate (refer to
IDENTIFICATION LABEL on page
Installed Software version (refer to P023).
Data on the application and inverter settings.

6.4 PREVENTIVE MAINTENANCE

DANGER!
Always turn off the mains power supply before touching any electrical component
associated to the inverter.
High voltages may still be present even after disconnecting the power supply.
To prevent electric shock, wait at least ten minutes after turning off the input
power for the complete discharge of the power capacitors. Always connect the
equipment frame size to the protective ground (PE). Use the adequate connection
terminal at the inverter.
DANGER!
Toujours couper l'alimentation électrique avant de toucher les composants
électriques de l'onduleur. Des hautes tensions peuvent encore être présentes
même après la déconnexion de l'alimentation. Pour éviter tout choc électrique,
attendez au moins 10 minutes après la mise hors tension de la puissance d'entrée
pour la décharge complète de la puissance des condensateurs. Branchez
toujours l'équipement Taille de cadre à la terre de protection (PE). Utilisez la borne
de connexion adéquat à l'onduleur.
ATTENTION!
The electronic boards have electrostatic discharge sensitive components.
Do not touch the components or connectors directly. If necessary, first touch the
grounded metallic frame size or wear a ground strap.
Do not perform any withstand voltage test: if necessary, consult WEG.
The inverters require low maintenance when properly installed and operated.
35
presents the main procedures and time intervals for preventive maintenance.
on page 35
provides recommended periodic inspections to be performed every 6 months
after the inverter start-up.
34 | CFW300
11).
Section 2.4
Table 6.2 on page
Table 6.3

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido