Descargar Imprimir esta página

Toshiba Carrier MMD-UP0071 SPH-UL Manual Del Usuario página 10

Publicidad

Idiomas disponibles

Idiomas disponibles

 Heat insulating process
• As shown in the figure, cover the flexible hose and hose band with the attached heat insulator up to the bottom
of the indoor unit without gap.
• Cover the drain pipe seamlessly with a heat insulator locally procured so that it overlaps with the attached heat
insulator of the drain connecting section.
Wrap the attached heat insulator seamlessly
from the surface of the indoor unit.
* Direct the slits and seams of the heat insulator
upward to avoid water leakage.
17-EN
Heat insulator of the
Heat insulator
drain connecting
(Locally procured)
section (Accessory)
Banding band
(Locally procured)
– 9 –
18-EN

Publicidad

loading