Descargar Imprimir esta página

cecotec 5290 STONE PRO Manual De Instrucciones página 24

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
ENGLISH
1. PARTS AND COMPONENTS
Fig. 1
1.
Short suspension tube
2.
Long suspension tube
3.
Ceiling bracket cover
4.
Body cover
5.
Ceiling bracket
6.
Motor
7.
Remote control receiver
8.
Remote control
9.
LED light
10.
Blades
11.
Remote control holder
12.
Light cover
13.
Tools
Remote control
Fig. 2
1.
Fan power button
2.
Winter/Summer function (blade spinning inversion)
3.
Power levels
4.
Timer (2 or 8 hours)
5.
ON/OFF LED light button
6.
Light intensity decrease button
7.
Light intensity increase button
NOTE:
The graphics in this manual are schematic representations and may not exactly match the
product.
2. BEFORE USE
-
This appliance is packaged in a way as to protect it during transport. Take the device out
of its box and remove all packaging materials. You can keep the original box and other
packaging elements in a safe place. This will help you prevent product damage when
transporting it in the future. In case the original packaging is disposed of, make sure all
packaging materials are recycled accordingly.
46
ENERGYSILENCE AERO 5290 STONE PRO
ENERGYSILENCE AERO 5290 GOLDEN PRO
-
Make sure all parts and components are included and in good conditions. If any of them
are missing or not in good condition, please contact Cecotec's official Technical Support
Service immediately.
3. PRODUCT ASSEMBLY
The following tools are required to carry out the installation: screwdriver, flat-head screwdriver,
adjustable pliers or wrench, stepladder, wire cutter, epoxy resin, and rated electrical tape.
General assembly instructions
-
If you hang the fan on a hook, it must withstand at least 100 kg.
-
Make sure that the building structure can hold the full weight of the fan.
-
The hanging length can be extended by using a longer downrod.
Mounting bracket assembly
Wooden ceiling
Fig. 3
Use the the 4 self-tapping screws provided and their 4 corresponding washers to fix the
mounting bracket to the ceiling.
Concrete ceiling
Fig. 4
Drill 2 8-mm holes on the concrete ceiling.
1.
Cover the surface of every bolt with epoxy resin and introduce them in the previously
drilled holes.
2.
Let them sit for the time indicated on the product box.
3.
Then, introduce the visible part of the bolts in the mounting plate holes.
4.
Fix the mounting plate to the bolts with the regular washers first, then the lock washers
and finally the nuts.
Hanging the fan
Note
If you wish to extend the fan hanging length, remove the hanging ball from the downrod
provided and use the extended downrod (included).
1.
Remove the hanging ball from the downrod by loosening the screws in it and remove the
stop pin clip and the stop pin.
2.
Slide down the hanging ball from the original downrod to remove it.
ENGLISH
ENERGYSILENCE AERO 5290 STONE PRO
47
ENERGYSILENCE AERO 5290 GOLDEN PRO

Publicidad

loading

Este manual también es adecuado para:

5290 golden pro