Descargar Imprimir esta página

SOMFY 5054415A Manual De Instalación página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

Application
POINTS TO CHECK PRIOR TO INSTALLATION
Preliminary checks
Ensure that the gate structure is strong enough. In all cases, the drive rod must push the gate section towards a
reinforced point.
It must be possible to move the gate by hand without encountering any hard point. Check that the gate is in good
condition and is perfectly balanced.
The gate section limit stops mounted on the ground must be provided for both the opening and closing directions. Somfy
recommends installing gate open limit stops to improve the way the gate is held open.
For an existing gate, check component wear. If necessary, repair or replace faulty or worn parts.
If the gate does not include any reinforcing, use metal reinforcing plates when attaching brackets.
Safety instructions
Be sure to follow these safety instructions throughout installation:
Take off any jewellery worn (bracelet, neck chain or other) during installation
During drilling and welding operations, always wear special goggles and suitable protective clothing
Always use proper tools
Never connect to the mains power or the battery backup before fi nishing the assembly process.
4
1 m
2 m
H y
y L
y 4
m
Copyright © 2008 Somfy SAS. All rights reserved.

Publicidad

loading

Este manual también es adecuado para:

Ixengo l