Bühler technologies GAS 222.11 Ex1 Guía Rápida página 14

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

GAS 222.11 Ex1
DANGER
Explosion hazard due to flame propagation
Severe injuries and damage to the system
If the process holds a risk of flame propagation, install a
flame arrestor.
4.3 Installing the sampling tube (optional)
The sampling tube, if necessary with the fitting extension,
must be screwed in. The probe is then attached to the mating
flange using the included seal and nuts.
4.4 Installing the downstream filter
NOTICE
The downstream filter and the O-ring for the handle must be
inserted prior to first startup.
Operating without downstream filter prohibited!
O-ring handle
4.5 Installing the upstream filter (Optional)
The upstream filter, if necessary with matching extension,
must be screwed in. The probe is then attached to the mating
flange using the included seals and screws.
14
Bühler Technologies GmbH
4.6 Connecting the Gas Line
The sample gas line must be carefully and properly connected
using a suitable fitting.
This table provides an overview of the sample gas probe con-
nections:
Connect-
ing flange
1)
Sample
gas inlet
Sample
gas outlet
Attach an O-ring suit-
Blowback
able for the expected
connec-
ambient temperature
tion
(see "Spare Parts and
Accessories").
Test gas
connec-
Attach the down-
tion
stream filter to the
handle. Then carefully
Filling
insert the handle with
port
filter in the gas probe
and turn 90° to se-
Condens-
cure.
ate
Bypass
Verify the handle is
seated correctly.
Control
When seated correctly
air
it locks onto the filter
Tab. 1: Gas Probe Connections (Varies by Model)
housing.
1)
Please note the following items when connecting the sample
gas line (NPT 1/4") on heated probes to prevent thermal
bridges:
Fragile
The insulation is fragile. Handle with care, do not drop.
After connecting the sample gas line it must be braced and se-
cured with the clamp.
Long sample gas lines may require additional support clamps
along the way to the analysis system! Once all lines have been
connected and checked for leaks, carefully reinstall and secure
the insulation.
Probe
Reservoir
GAS 222
PAV01
DN65/
PN6/
DN3"-150
G3/4
NPT 1/4
G3/8
Tube Ø6
mm
1)
Tube
Ø1/4
NPT 1/4
G1/2
NPT 1/4
Varies by version.
• Choose the shortest possible screw connection.
• Shorten the connection pipe for the sample gas line as
much as possible. To do so, remove the insulation around
the sample gas line. This is done by loosening the fixing
bolts.
CAUTION
Ball
Ball valve
Control
valve/
pneu-
valve
blowback
matic
3/2-way
valve
drive
solenoid
(without
valve
PAV01)
Ø12
G1/8
G1/4
BX460073 ◦ 04/2023