Commissioning
Preparatory measures
1.
Check that the installation complies with the regula-
tions.
2.
Check the feed chemical: Avoid particles.
3.
Check the direction of rotation of the motor.
4.
Check the earthing lines.
5.
Open the vent plug of the gear.
EN
14
Note the following during commissioning:
Keep the suction line as short as possible.
Ensure that the height h is only less than or equal to
the suction lift of the pump, divided by the density of
the feed chemical.
Dimension the cross-section of the suction line in
such a way that the negative pressure created during
suction cannot reach the vapour pressure of the feed
chemical (cavitation!).
When priming, set the stroke length to 100% and, if
possible, depressurise the pressure side.
Adhere to the instructions in the operating instructions
for metering pumps with integral vent valve.
The valves may no longer close properly with feed
chemicals with a particle size of greater than 0.3 mm.
Install an appropriate filter in the suction line.