Descargar Imprimir esta página

DAB AC 65/180 Instrucciones De Instalación Y Funcionamiento página 64

Bombas de circulación

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 84
64
english
6. Initiation/operating control
6.1 General
Flush system thoroughly without pump. See section 4.
Fill and de-aerate the system properly.
Only put the pump into operation when the system is full.
Switch on the distribution voltage.
6.2 Venting
Venting of the pump, particularly of the motor space,
is performed automatically after a brief period of operation.
Running dry briefly (max. 2 mins.) does not harm the motor.
There is a danger of scalding
6.3 Operating control
An LED must always be on in sector A2.
See 5.4.1.
6.4 Deblocking
Not necessary. Motor starts with high torque, see section 8.
7. Maintenance, servicing
Before performing maintenance on the pump,
make sure that the pump is taken out of operation,
disconnect all poles from the power grid, and secure
from switching on again.
Only have trained staff do this work.
Mind the operating instructions.
Only perform this work when the system is at standstill.
Take the pump off power.
Switch off the fuse and put on warning signs.
The media in the system may scald you.
The hot surfaces may scald you.

Publicidad

loading

Este manual también es adecuado para:

Ac 65/180 xAc 80/180Ac 80/180 xAc 110/180 x