Descargar Imprimir esta página

Ecolab EcoPro Instrucciones De Servicio página 181

Ocultar thumbs Ver también para EcoPro:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Changing from countertop-mounted to wall-mounted
To enable the pump to be adapted to the local conditions, it is possible to use the pump
upright (upright-mounted) or suspended (wall-mounted).
Fig. 36: Changing from countertop-mounted (upright) to wall-mounted (suspended)
1.
Remove the connector lines as necessary (hydraulic and electrical).
2.
Press the fixing tab on the mounting plate down to release the lock on the pump.
3.
Move the pump forward on the mounting plate until the fixing elements disengage
from the pump base.
4.
Remove the pump from the mounting plate by lifting upwards.
5.
Change over the fixing elements on the mounting plate to wall mounting (see
Ä
'Wall mounting' on page 31 , Fig. 5 ,
6.
Fit the mounting plate on the wall.
7.
Place the pump on the mounting plate from above so that the fixing elements on the
mounting plate engage in the recesses on the side of the pump.
8.
Push the pump downwards onto the fixing elements until they audibly engage.
9.
Attach the connecting lines (hydraulic and electric):
Ä Chapter 6.2.1 'Hydraulic installation' on page 32
Ä Chapter 6.2.2 'Electrical installation' on page 40 .
12.2
Upgrades
Upgrading – from 'EcoPro' to 'EcoAdd'
DANGER!
Risk of electric shock
Be sure to disconnect the power supply immediately and to secure against
accidental switch-on!
and
)
3
4
79
Modification/upgrade
MAN046879 Rev. 12-12.2023

Publicidad

loading