2. Prepare the Site
NOTICE: Measure your product for site preparation. Note the model number located on the components end of the bath,
then visit the product page at kohler.com for additional information.
NOTICE: Remote blower installation is required for freestanding bath installation. Refer to the Installation Instructions
included with the remote blower kit before installing the remote blower.
IMPORTANT! For a successful installation, install the bath on a level, finished floor.
IMPORTANT! Verify that the subfloor offers adequate support for the bath.
Follow all local plumbing and building codes.
Temporarily position the bath and shroud in the installation location.
Verify that the bath is level. Shim under the shroud if necessary, and secure the shims to the floor with construction
adhesive.
Without moving the shroud, lift and remove the bath from the shroud.
Trace the shroud cutout area onto the floor.
Remove the shroud and set it aside.
Refer to the Specification Sheet on the bath product page at kohler.com to determine any drain clearance requirements,
and cut adequate floor clearance as needed.
Refer to the Specification Sheet on the bath product page at kohler.com for drain height details. Position and install a
standard PVC or brass bath drain pipe to the correct height.
1512795-2-A
Shroud
Trace the
cutout.
6
Kohler Co.