Descargar Imprimir esta página

Sungrow SG2.0RS-S Guía De Instalación Rápida página 33

Ocultar thumbs Ver también para SG2.0RS-S:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23
4
AC
It is recommended to use heavy duty conduits when run cables through Cavity walls, or lay out cables with corresponding conduits.
A RCD is not required if either of these two installation methods is adopted according to the local standard AS3000-2018.
(For "AU" and "NZ")
1
4
7
5
AC~
OFF
2
1
6 5
2
8
2
1
SG2.0RS-S / SG2.5RS-S /
SG3.0RS-S : 25 A
SG3.0RS / SG3.6RS /
SG4.0RS / SG5.0RS: 32 A
SG6.0RS: 40 A
D
(1) 10-12 mm
(2) 12-16 mm
(3) 16-21 mm
Click
M4
0.5 N m
.
32
M4
1.2 N m
.
OT terminal
(Self-prepared)
RCD (if required):
triggered at a residual current of ≥ 300 mA for
others (according to local regulations)
2
4-6 mm
3
ø10-21 mm
A
A: ≤45 mm
B: 12-16 mm
6
PE
N
L
B
33 mm
5-6 N m
.

Publicidad

loading

Este manual también es adecuado para:

Sg2.5rs-sSg3.0rs-sSg3.0rsSg3.6rsSg4.0rsSg5.0rs ... Mostrar todo