Descargar Imprimir esta página

Dea NET24 Instrucciones De Uso Y Advertencias página 51

Cuadro de maniobra programable

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 123
9 INSTALLATION TEST
The testing operation is essential in order to verify the correct installation of the system. DEA System wants to summarize the proper
testing of all the automation in 4 easy steps:
● Make sure that you comply strictly as described in paragraph 2 "WARNINGS SUMMARY";
● Test the opening and closing making sure that the movement of the leaf match as expected. We suggest in this regard to perform va-
rious tests to assess the smoothness of the gate and defects in assembly or adjustment;
● Ensure that all safety devices connected work properly;
● Perform the measurement of impact forces in accordance with the standard 12445 to fi nd the setting that ensures compliance with
the limits set by the standard EN12453.
10 PRODUCT DISPOSAL
WARNING In compliance with EU Directive 2012/19/EU on waste electrical and electronic equipment (WEEE), this electrical prod-
uct should not be treated as municipal mixed waste. Please dispose of the product and bring it to the collection for an appropriate
local municipal recycling.
EN-19

Publicidad

loading

Este manual también es adecuado para:

Net24nNet230