Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3.6.

INSTALLATION TESTS

According to standard DIN EN 12469 and in order to ensure correct cabinet operation, after
the installation and connection of the cabinet, it is compulsory to perform the following tests
(before the equipment is used for the first time)
Impulsion filters integrity Test.
-
Exhaust filters integrity Test.
-
Inflow filters integrity test (Only model BiOptima Cyto)
-
Downflow air velocity.
-
Downflow set points alarm test.
-
Inflow air velocity Test.
-
Inflow set points alarm test.
-
Smoke test.
-
TELSTAR also recommends making the following tests:
Light Test.
-
Noise Level Test
-
Telstar, its representatives and distributors put a qualified technical team at your disposition
that uses control equipment with maximum health protection for carrying out this installation
test under full safety guarantees.
UM-BiOptima-EN-1907
14 / 39

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Bioptima cyto

Tabla de contenido