Descargar Imprimir esta página

Chamberlain LiftMaster PROFESSIONAL SECURITY + 1210E FS2 Manual Del Propietário página 10

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY STEP 1
For Sliding and
Swinging Gates ONLY
Assemble the T-Rail and
Attach the Chain Pulley
Bracket
To avoid installation difficulties, do
not run the garage door opener until
instructed to do so.
1. Place the 3 T-rail sections on a flat
surface for assembly. The end
sections are identical. Make sure the
"arrow label" on the center section is
pointing in the direction shown in the
illustration.
2. Connect the center section and the 1/4" lock nuts to
the end sections from the same side, as shown.
NOTE: If T-rail is not assembled exactly as shown,
trolley will not travel smoothly along length of rail or it
will hit against nuts.
3. Insert the carriage bolts from the opposite side of the
end sections. Tighten the nuts. When assembled,
T-rail has a front-to-back position as shown.
4. Position the chain pulley bracket on the front end of
the T-rail as shown. Fasten securely with the
hardware provided.
NOTE: When tightening the bolts be sure to keep
bracket parallel to the rail. Otherwise, the rail may
bow when the opener is operated.
Rail
(End Section)
Rail connects to
opener at this end.
Brace
Square Carriage
Bolt Holes
HARDWARE
SHOWN ACTUAL SIZE
Hex Bolt
5/16"-18x7/8"
1/4'' Lock Nut
Brace
Rail
(Center Section)
Hex Bolts
5/16"-18x7/8"
Tuerca de 1/4"
10
Carriage Bolts
Lock Nut
1/4"-20x1/2"
1/4"-20
Lock Washer
Nut
5/16"-18
5/16"
11 mm Socket Wrench
Chain pulley bracket
attaches to this
end of Rail
Rail
(End Section)
AWAY FROM
OPENER
Carriage Bolt
1/4"-20x1/2"
Chain Pulley
Bracket
El sostÈn de la polea
del cable se fija a este
extremo del riel.
Lock Washer
5/16"
Nut
Riel
5/16"
(SecciÛn Extrema)
13 mm Socket Wrench

Publicidad

loading

Este manual también es adecuado para:

Liftmaster professional security + 1220e fs2