Descargar Imprimir esta página

Thermo Scientific Precision GP 20 Manual Del Usuario página 52

Publicidad

3
Installation | Section 3
Chapter 3 Installation
Bath Installation
The bath is designed for continuous operation and for indoor use.
Never place the bath in a location where excessive heat, moisture or corrosive
materials are present.
Ventilation
No special ventilation clearances are required.
Cover Installation
Figure 3-1 – GP Bath Cover Installation
Thermo Scientific
Precision | 3-1

Publicidad

loading

Este manual también es adecuado para:

Precision gp 28Precision gp 15d