Descargar Imprimir esta página

Autoclima RT 120 Instrucciones De Montaje, Uso Y Mantenimiento página 35

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Insert the wiring L connecting the central control unit inside the vehicle together with the coolant pipes, making
it run parallel, and aim it towards the engine compartment and the driver's cab for connection to the battery,
compressor and the central control unit (electrical system layout).
10
In the versions with heating (RTH) also connect the wiring H (supplied) for connecting the water solenoid
valve and water pump (not supplied but available separately for purchase) (electrical system layout).
In the versions with external air inlet there is also wiring for connecting the recirculation system actuator with
the relative relay, positioned in the plate (fig. 16 and electrical system layout).
Empty the system and pre-charge with coolant, then look for any leaks.
If there are no leaks, reconnect the battery, start the engine and fill up with coolant.
11
For the roof unit RT / RTH 120: 1.3 kg of R134a for a system with delivery and suction pipes that connect the
compressor to the roof unit each measuring 12 metres long.
12
Refit the components removed previously.
ENGLISH
INDICATIVE QUANTITY OF COOLANT
35/71
RT 120 - RTH 120

Publicidad

loading