Descargar Imprimir esta página

Sartorius Quintix Pro QTX324IRU-1z Instrucciones De Manejo página 23

Balanzas analíticas y de precisión

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 101
9
Decommissioning
Procedure
Disconnect the power supply cable from the power supply at the instal-
t
lation site.
Remove the weighing pan and the corresponding components from the
t
device (see Chapter "8.1 Dismounting the Weighing Pan and Associated
Components (Only for Analytical Balances)", page 21).
If the device with draft shield is used: Dismount the draft shield (see
t
Chapter "8.2 Dismounting the Draft Shield", page 22).
Clean the device (see Chapter "8.3 Cleaning the Device", page 22).
t
10 Transport
10.1
Transporting the Device
Procedure
Disconnect the power supply cable from the power supply at the instal-
t
lation site.
CAUTION Risk of cuts from broken glass when lifting or transporting!
t
Do not carry the device by the draft shield.
t
Use both hands to carry the device. To do this, reach sideways under
t
the device with both hands.
Do not use the device if the draft shield is damaged.
t
If required: Contact Sartorius Service.
t
Reach sideways under the device with both hands.
t
Decommissioning
Operating Instructions Quintix
Pro
23
®

Publicidad

loading