Descargar Imprimir esta página

Mennekes AMTRON 4You 100 11 Manual De Instrucciones Y De Instalación página 39

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 63
9
Protection class
10 Number of poles
11
Use
3.3
Delivery contents
n Product
n Quick guide for the user
n Quick guide for the qualified electrician
n Front cover *
n Bag with installation materials (screws, dowels,
sealing plugs), membrane glands, plug connect-
ors and cable ties
n Charging point labelling according to EN 17186
n Additional documents:
n Drilling template (printed and perforated on
cardboard box insert)
n Circuit diagram
n Test certificate
* The front cover is available from MENNEKES in
other colours.
3.4
Product structure
Exterior view
3
Fig. 2: Exterior view (example)
1
Top section of housing with front cover
2
LED status display
3
Bottom section of housing
Interior view
Fig. 3: Interior view
1
Cable glands *
2
Terminals
n Terminals 1 and 2 for connecting an external
n Terminals 3 and 4 for connecting an ex-
3
MCU (MENNEKES Control Unit)
1
4
Terminals for connecting an external shunt re-
2
lease
5
DIP switches
6
Connection for the MENNEKES configuration
cable
7
Connection terminals for power supply
* Additional cable glands are installed on the top
and bottom.
3.5
The LED status display indicates the operating
status (standby, charging, fault) of the product.
1
7
6
5
4
switching contact (downgrade input)
ternal switching contact (downgrade input)
LED status display
EN
2
3
7

Publicidad

loading